Department of Energy
  • doe@vanuatu.gov.vu
  • (678)25201
  • Home
  • About Us
    • Vision, Mission & Values
    • Our Team
    • Core Values
    • Our Structure
    • Energy Actors
  • Projects
    • View Projects
    • Projects Map
  • ENERGY SECURITY
    • Energy Efficiency & Conservation
      • MEPSL
        • General Information
        • Registration
      • Energy Audits
      • Energy Consumption
      • How to obtain an Appliance Registration Certificate
    • Petroleum
  • NGEF
    • General Information
    • Reports
  • VREP II
    • Component II
      • Background
      • Roles and Responsibilities
      • Grievance Redress Mechanism(GRM)
      • Definitions
      • GRM Form
    • Product Catalogue
  • Documents
    • VREP Project Files
    • Publications
    • Workshop Materials
    • Reports
  • News & Events
    • Events
    • Vacancies
    • News
      • Energy Focus Newsletter
  • Contact Us
  • Search

Moving Vanuatu beyond #40 with Green Energy. Yumi 40 Vanuatu Flag

  • You are here:  
  • Home /
  • Projects /
  • On-Grid /
  • Brenwei Hydro Project
20171205_133822
20171205_133822
IMG_20180213_115108800_BURST017

Featured item Brenwei Hydro Project

Print
Category: On-Grid

The Brenwe Hydro Project will include a run of river hydropower station, with a generation capacity of a 422kW, from twin impulse turbines. The main elements of the scheme are the intake weir, three phase transmission cable (to public road) and access roads to the intake, forebay and powerhouse. The hydropower station will be located on the Brenwei River, approximately 4.5km north of Brenwe village in Northwest Malekula.

ADB's Energy Access Project (the project) will assist the Republic of Vanuatu‟s (the Government) efforts to reduce the country‟s heavy reliance on imported fossil fuels for power generation by providing a secure, sustainable and environmentally sound source of electricity for private and commercial consumers. The impact of the project is expected to improve the livelihoods of households in Malekula. The outcome of the project will support Government policy in increasing the supply of clean renewable electricity to households in Malekula.

The project will have the following outputs:
(i) distribution grid extension in Malekula island
(ii) Brenwe Hydropower Project (BHPP) in Malekula
(iii) capacity building
(iv) efficient project management services.

The feasibility study was undertaken in 2014 under Project Preparatory Technical Assistance (PPTA) funded by the Asian Development Bank (ADB) and further studies that took place in early 2016.

Donor Asian Development Bank
Funding N/A
Stakeholders Government of Vanuatu, People of Vanuatu
Officer Responsible Matthew Tasale
Period N/A

Location

Brenwe, Vanuatu

Attachments

File NameFile TypeFile SizeHits
VAN EAP Land Acquisition Resettlement Plan PDF6.56 MB0 hits

Contact Us

Meteo Complex, Nambatu Area, PMB 9067
Port Vila Vanuatu

Landline: (678) 25201

E-mail: doe@vanuatu.gov.vu

Facebook: www.facebook.com/DoE.Vanuatu

Twitter: www.twitter.com/DoE_Vanautu

Copyright Simpli - Best Free Joomla Template. Designed by JoomlArt.com. Modified for use by the OGCIO, Government of Vanuatu

Other Related Sites

  • Government of Vanuatu
  • Vanuatu Project Management Unit
  • Vanuatu Meteorological & Geohazards Department
  • Department of Environmental Protection & Conservation
  • Ministry of Lands and Natural Resources
  • Utilities Regulatory Authority
  • Unelco
  • Vanuatu Utilities & Infrastructure
  • Origin Gas

Our Location