Sub Categories

Whole Country, Vanuatu
VREP II will support SHS, micro and mini grids in rural areas, strengthen institutions, and increase business opportunities for the private sector for the supply decentralized electricity services. REP II will transition from “plug and play” systems to more advanced SHS that require technical support, micro grids and mini grids where the latter can be supported on economic or piloting benefits.

Brenwe, Vanuatu
The Brenwe Hydro Project will include a run of river hydropower station, with a generation capacity of a 422kW, from twin impulse turbines. The main elements of the scheme are the intake weir, three phase transmission cable (to public road) and access roads to the intake, forebay and powerhouse. The hydropower station will be located on the Brenwei River, approximately 4.5km north of Brenwe village in Northwest Malekula.
Whole Country, Vanuatu
Recognising that access to affordable, safe and reliable electricity in Vanuatu is a major development need for the country and with over 20,000 households, 200 aid posts and 2,000 not-for-profit community halls located in areas where access to grid electricity is uneconomic.
Maewo Island, Vanuatu
The preliminary survey for the development of a micro-hydro system at Talise River on Maewo Island, was conducted in 1998. In 2001 and 2002 feasibility studies were conducted by Appropriate Technology for Community And Environment (APACE).