Parliament House & Meteo Buillding, Port Vila, Vanuatu

Masdar and MCCND have been engaged in negotiations concerning the development, building and commissioning of a 500 kW solar grid connected system (the “Plant”) and associated facilities at the project site located at the MCCND complex and the Parliament complex (the “Project”).

WnAVntTG6XQpXzmKalW74zp3J6m_3Czh
Category: On-Grid
Created by: Super User

Maewo Island, Vanuatu

The preliminary survey for the development of a micro-hydro system at Talise River on Maewo Island, was conducted in 1998. In 2001 and 2002 feasibility studies were conducted by Appropriate Technology for Community And Environment (APACE).