WnAVntTG6XQpXzmKalW74zp3J6m_3Czh
Created by: Super User

Maewo Island, Vanuatu

The preliminary survey for the development of a micro-hydro system at Talise River on Maewo Island, was conducted in 1998. In 2001 and 2002 feasibility studies were conducted by Appropriate Technology for Community And Environment (APACE).

 

jacqipGUTXoMcbPZLllrCbJ2j2IewqOb
Created by: Super User

Port Vila, Luganville, Tanna and Malekula, Vanuatu

The Government of Vanuatu proposes to make available, through local private utilities (UNELCO & VUI), a one-off subsidy to assist households to connect to the existing electricity grid concession areas in Port Vila, Tanna, Malekula and Luganville.